Deniliquin BESS - Storage - KCI

BESS · Enervest Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
150 MW
Researched capacity
Est. SRMC
$1.58/MWh
Key information
Capacity (AI)
150 MW

No reliable public project announcement or planning source was available in the provided results to verify MW/MWh beyond the AEMO spreadsheet entry; the entry itself lists 150.00 MW and 0.00 MWh.

AEMO status Publicly Announced
Project status Development (AI)

AEMO-style listing shows the asset as "Publicly Announced"; absent a build/commissioning source, the safest inferred phase is development.

Coordinates

DUID
Owner Enervest Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
150 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$217.51M

Shown in table
$217.51M (2026 real AUD)

Reported / source value
$206.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project-specific estimated development cost for Deniliquin BESS.

Reference
Deniliquin Battery Energy Storage System ESTIMATED DEVELOPMENT COST (EDC) (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MWh storage

How this was derived
Derived from the EDC document’s stated 120 MW / 480 MWh battery system line item, but this may not match the user-supplied 150 MW capacity and is therefore lower confidence.

Reference
Deniliquin Battery Energy Storage System ESTIMATED DEVELOPMENT COST (EDC) (low confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$3.96M

Shown in table
$3.96M (2026 real AUD)

Reported / source value
$3.75M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side default used because no plant-specific O&M source was found.

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side default used because no plant-specific variable O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
No owner-specific capex announcement for this exact 150 MW site was found. The project-specific NSW Estimated Development Cost report for Deniliquin BESS (SSD-72258210) provides an indicative cost estimate of $206,202,342 excluding GST, assessed 23/12/2024 and escalated to an assumed Jan 2027 construction start. This is a project-specific estimate rather than an owner press-release investment announcement. The report describes a 35-year operating life and Q1 2027 start, but the current schema stores capex_year as the report/assessment year because a greenfield announcement year was not available. Fixed and variable OPEX used server defaults.

Sources