Deargee

BESS · ACEN Renewables · Storage - Battery

AEMO: removed Other - Other NEM data · 7 days
700/2,800 MW
Registered nameplate capacity / storage
Est. SRMC
$1.58/MWh
Key information
Capacity
700 MW / 2,800 MWh

AEMO status removed
Project status (AI)

Coordinates

DUID
Owner ACEN Renewables
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
10 Jun 2026 21:15 → 17 Jun 2026 21:15 AEST

Dispatch & revenue

10 Jun 2026 21:15 → 17 Jun 2026 21:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
700 MW / 2,800 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$1,033.76M

Shown in table
$1,033.76M (2026 real AUD)

Reported / source value
$980.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
ACEN’s Deeargee/Deargee project is publicly described as a proposed 320 MW solar and battery project, with battery storage up to 1,400 MW AC two-hour or 700 MW AC four-hour configuration. I could not find a plant-specific greenfield capital cost announcement from ACEN, government, or project finance sources in the available search results, so no capex value is reported. For battery assumptions, I used AEMO/Aurecon 2024 BESS benchmark technical parameters: 4-hour BESS EPC cost $324.1M for a 200 MW system, indicative round-trip efficiency ~85%, and 20-year design life; however, these are not treated as project-reported capex. Variable O&M uses the provided default fallback because the AEMO BESS benchmark excerpt available did not expose a comparable variable O&M figure.