13 Jun 2026 00:00 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
$140.19M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$175,234
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026
Notes
No plant-specific APA announcement or project page for a Darling Downs BESS at APA was found in the provided search results. The nearby Wandoan South BESS (Vena Energy, 100 MW / 150 MWh) is in the Darling Downs region and had a reported construction budget of $120 million, but it is a different asset and should not be used as capex for this APA site. Because no verified APA-specific greenfield capex or operating assumptions were located, financial fields remain unfilled pending further review. Battery storage has no fuel cost or heat rate; emissions intensity is operationally zero.