Darling Downs BESS (APA)

BESS · APA Group · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 311h
200/800 MW
Researched capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
200 MW / 800 MWh

APA Group / project references indicate a 200 MW battery with 800 MWh storage capacity (APA project materials / NEM-facing references).

AEMO status Publicly Announced
Project status Development (AI)

APA Group project information not publicly documented as under construction or commissioned in available sources; treated as development based on publicly announced status.

Coordinates

DUID
Owner APA Group
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM Tesla
Inverter / PCS model Megapack inverter/PCS (integrated)
Equipment confidence low
Stats window
01 Jun 2026 00:00 → 13 Jun 2026 22:35 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 13 Jun 2026 22:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
200 MW / 800 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$140.19M

Shown in table
$140.19M (2026 real AUD)

Reported / source value
$120.00M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is a nearby Darling Downs-region BESS, but it is not APA's Darling Downs BESS and should not be used as the APA site's capex.

Reference
Wandoan South BESS (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$175,234

Shown in table
$175.2k (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

How this was derived
The source contains large-scale BESS O&M estimates, but the relevant values were not extracted from the open lines provided here, so no numeric fallback is set in the JSON.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No plant-specific APA announcement or project page for a Darling Downs BESS at APA was found in the provided search results. The nearby Wandoan South BESS (Vena Energy, 100 MW / 150 MWh) is in the Darling Downs region and had a reported construction budget of $120 million, but it is a different asset and should not be used as capex for this APA site. Because no verified APA-specific greenfield capex or operating assumptions were located, financial fields remain unfilled pending further review. Battery storage has no fuel cost or heat rate; emissions intensity is operationally zero.

Sources