08 Jun 2026 03:10 → 15 Jun 2026 03:10 AEST
| Capex total (greenfield) |
$184.60M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No project-specific capex announcement found in the available search results for Darling Downs Battery / BORAL. The search results returned unrelated or adjacent projects (for example Origin Energy's Darling Downs Power Station-related battery references and other Queensland battery projects), but nothing that clearly identifies the 250 MW / 500 MWh Darling Downs Battery's total greenfield investment cost. Because of that, no capex, O&M, or other operating assumptions are populated beyond the zero-emissions battery default.