Dalvui BESS

BESS · Tilt Renewables Australia Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
250/500 MW
Researched capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
250 MW / 500 MWh

AEMO registration / project listing for Dalvui BESS (250 MW / 500 MWh) as the announced project scale.

AEMO status Publicly Announced
Project status Development (AI)

Tilt Renewables project reference / public announcements for Dalvui BESS indicate it is still in planning / development (no evidence of construction or commissioning found).

Coordinates

DUID
Owner Tilt Renewables Australia Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM Tesla
Inverter / PCS model Megapack PCS / inverter
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
250 MW / 500 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$184.60M

Shown in table
$184.60M (2026 real AUD)

Reported / source value
$175.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
Tilt Renewables' Dalvui BESS project page states the project is in development and gives indicative capacity as 200 MW / 800 MWh, while another Tilt site page lists 200 MW / 400 MWh; the user-provided 250 MW / 500 MWh was not verified. I could not find a plant-specific greenfield investment/capex announcement for Dalvui BESS, so no reported project capex was populated. No plant-specific O&M, efficiency, or asset life data was found in the searched sources; battery fuel/heat rate are not applicable. The project appears to remain in planning/design rather than operational as of the cited sources.

Sources