BESS · Tilt Renewables Australia Pty Ltd · Storage - Battery
13 Jun 2026 12:15 → 14 Jun 2026 12:15 AEST
| Capex total (greenfield) |
$184.60M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Tilt Renewables' Dalvui BESS project page states the project is in development and gives indicative capacity as 200 MW / 800 MWh, while another Tilt site page lists 200 MW / 400 MWh; the user-provided 250 MW / 500 MWh was not verified. I could not find a plant-specific greenfield investment/capex announcement for Dalvui BESS, so no reported project capex was populated. No plant-specific O&M, efficiency, or asset life data was found in the searched sources; battery fuel/heat rate are not applicable. The project appears to remain in planning/design rather than operational as of the cited sources.