Culcairn Solar Farm

Solar · Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust · Solar PV - Single axis tracking

AEMO: removed Solar - Solar NEM data · 7 days
350 MW
Registered nameplate capacity
Est. SRMC
$0.00/MWh
Key information
Capacity
350 MW

AEMO status removed
Project status (AI)

Coordinates

DUID
Owner Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust
Commissioned Jul 2025
Expected closure 2025
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
09 Jun 2026 01:00 → 16 Jun 2026 01:00 AEST

Dispatch & revenue

09 Jun 2026 01:00 → 16 Jun 2026 01:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
350 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$820.51M

Shown in table
$820.51M (2026 real AUD)

Reported / source value
$640.00M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Plant-specific greenfield construction cost for the project.

Reference
APPENDIX N ECONOMIC IMPACT ASSESSMENT (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$2,344,456

Shown in table
$2.34M (2026 real AUD)

Reported / source value
$1.83M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from reported total project cost and registered capacity of 349.98 MW.

Reference
APPENDIX N ECONOMIC IMPACT ASSESSMENT (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Set to zero for solar PV because no plant-specific variable O&M was found and solar fuel cost is nil.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project-specific construction cost was reported as approximately AUD 640 million in the NSW planning economic impact assessment, attributed to information provided by Neoen. The source does not explicitly state the value year; 2020 is used as the construction/planning year associated with the assessment. Solar PV plants have a technical and operational life of 30 years in the AEMO/Aurecon review. No plant-specific O&M figure was found, so no O&M estimate is populated here.