Solar · Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust · Solar PV - Single axis tracking
14 Jun 2026 17:05 → 15 Jun 2026 17:05 AEST
| Capex total (greenfield) |
$820.51M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,344,456
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific construction cost was reported as approximately AUD 640 million in the NSW planning economic impact assessment, attributed to information provided by Neoen. The source does not explicitly state the value year; 2020 is used as the construction/planning year associated with the assessment. Solar PV plants have a technical and operational life of 30 years in the AEMO/Aurecon review. No plant-specific O&M figure was found, so no O&M estimate is populated here.