Coonooer Bridge Wind Farm (CBWF1)

Wind · Coonooer Bridge Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 24 hours
20 MW
Registered nameplate capacity
Est. SRMC
$0.70/MWh
Key information
Capacity
20 MW

AEMO status In Service
Project status Operational (AI)

Region VIC1
Coordinates

DUID CBWF1
Owner Coonooer Bridge Wind Farm Pty Ltd
Commissioned
Expected closure 2036
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
14 Jun 2026 04:45 → 15 Jun 2026 04:45 AEST

Dispatch & revenue

14 Jun 2026 04:45 → 15 Jun 2026 04:45 AEST

No dispatch data for DUID CBWF1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
20 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.70/MWh
Capex total (greenfield)
$67.88M

Shown in table
$67.88M (2026 real AUD)

Reported / source value
$48.60M (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported greenfield construction cost for Coonooer Bridge Wind Farm.

Reference
Windlab Limited Prospectus / ASX announcement (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$3,428,136

Shown in table
$3.43M (2026 real AUD)

Reported / source value
$2.45M (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex intensity from reported total cost and installed capacity.

Reference
Windlab Limited Prospectus / ASX announcement (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$1.52M

Shown in table
$1.52M (2026 real AUD)

Reported / source value
$1.09M (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$76,816

Shown in table
$76.8k (2026 real AUD)

Reported / source value
$55.0k (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M benchmark was found in the searched sources; server-side default used.

Variable OPEX / MWh
$0.70

Shown in table
$0.70 (2026 real AUD)

Reported / source value
$0.50 (2015 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M benchmark was found in the searched sources; server-side default used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Greenfield construction cost sourced from Windlab prospectus case study: total construction cost $48.6 million for 19.8 MW, with construction commencing in 2015 and operation beginning 1 April 2016. No plant-specific refurbishment cost found. Fixed OPEX and variable OPEX fall back to provided internal defaults; wind has no fuel or heat rate.

Sources