BESS · ACEN RENEWABLES · Storage - Battery
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$33.76M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$1.01M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex figure was found in ACEN/public government sources for Cooma; ACEN describes the project as a proposed 80MW renewable energy generation project with a 180MW/2hr BESS, and NSW planning confirms a 100MW solar farm plus up to 80MW/320MWh BESS. In the absence of a project-specific investment announcement, battery capex was not estimated from benchmarks per instruction; O&M and performance defaults were taken from AEMO/Aurecon 2024 battery assumptions.