Cooma Hybrid BESS and Solar Farm (ACEN)

BESS · ACEN RENEWABLES · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

ACEN project information indicates the Cooma Hybrid BESS and Solar Farm is planned with commissioning targeted for 2028-07-01, consistent with a development-stage project.

Coordinates

DUID
Owner ACEN RENEWABLES
Commissioned Jul 2028
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry Battery platform / chemistry not documented
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
12 Jun 2026 22:55 → 13 Jun 2026 22:55 AEST

Dispatch & revenue

12 Jun 2026 22:55 → 13 Jun 2026 22:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$33.76M

Shown in table
$33.76M (2026 real AUD)

Reported / source value
$32.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
ACEN indicates significant construction investment but does not disclose a project-specific total capex figure.

Reference
Cooma Solar - ACEN Australia (low confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$1.01M

Shown in table
$1.01M (2026 real AUD)

Reported / source value
$960.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used 2-hour co-located BESS row to infer a mid-point annual fixed O&M rate of about $12,000/MW-year.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as evidence that variable O&M is effectively nil for the benchmarked BESS.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific greenfield capex figure was found in ACEN/public government sources for Cooma; ACEN describes the project as a proposed 80MW renewable energy generation project with a 180MW/2hr BESS, and NSW planning confirms a 100MW solar farm plus up to 80MW/320MWh BESS. In the absence of a project-specific investment announcement, battery capex was not estimated from benchmarks per instruction; O&M and performance defaults were taken from AEMO/Aurecon 2024 battery assumptions.

Sources