Cooma BESS (ACEN)

BESS · ACEN RENEWABLES · Storage - Battery

AEMO: removed Other - Other NEM data · 354h
80 MW
Registered nameplate capacity
Est. SRMC
$1.58/MWh
Key information
Capacity
80 MW

AEMO status removed
Project status (AI)

Coordinates

DUID
Owner ACEN RENEWABLES
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
01 Jun 2026 00:00 → 15 Jun 2026 17:30 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 15 Jun 2026 17:30 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
80 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$33.76M

Shown in table
$33.76M (2026 real AUD)

Reported / source value
$32.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No authoritative plant-specific greenfield capex figure was located in ACEN Australia, EPBC, or other official sources during the search.

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$2.11M

Shown in table
$2.11M (2026 real AUD)

Reported / source value
$2.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from the provided fallback O&M assumption and the stated 80 MW capacity.

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This was supplied as an internal technology default by the user and used only because no project-specific O&M figure was found.

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This was supplied as an internal technology default by the user and used because no project-specific variable O&M figure was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026

Notes
No plant-specific greenfield construction cost was found in official ACEN or government sources. ACEN describes the project as a proposed 80 MW battery co-located with a 100 MW solar project (180 MW / 2-hour BESS in later ACEN project pages), but publicly available materials did not disclose total project capex. Default battery O&M and capex assumptions were therefore used from the provided server-side fallback only for capex_per_mw_aud and O&M values, not as reported project cost. Fixed OPEX annual value is derived from 25,000 AUD/MW-yr × 80 MW.