14 Jun 2026 15:00 → 15 Jun 2026 15:00 AEST
| Capex total (greenfield) |
$33.76M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$2.11M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: unknown · AI checked 04 Jun 2026
Notes
No plant-specific greenfield construction cost was found in official ACEN or government sources. ACEN describes the project as a proposed 80 MW battery co-located with a 100 MW solar project (180 MW / 2-hour BESS in later ACEN project pages), but publicly available materials did not disclose total project capex. Default battery O&M and capex assumptions were therefore used from the provided server-side fallback only for capex_per_mw_aud and O&M values, not as reported project cost. Fixed OPEX annual value is derived from 25,000 AUD/MW-yr × 80 MW.