Comet Park BESS - KCI

BESS · Samsung C&T Renewable Energy Australia Pty Ltd. · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
189/600 MW
Researched capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
189 MW / 600 MWh

AEMO spreadsheet entry for Comet Park BESS - KCI (publicly announced) lists 189 MW / 600 MWh.

AEMO status Publicly Announced
Project status Development (AI)

Samsung C&T Renewable Energy Australia project listing / public announcements not yet indicating construction or commissioning.

Coordinates

DUID
Owner Samsung C&T Renewable Energy Australia Pty Ltd.
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Tesla
Battery platform / chemistry Megapack
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
189 MW / 600 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$221.52M

Shown in table
$221.52M (2026 real AUD)

Reported / source value
$210.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No project-specific greenfield capex announcement located in available web results for Comet Park BESS - KCI. Use of AEMO/CSIRO benchmark capex was not applied because the capex search priority requires a project-specific figure first. AEMO 2024 battery storage benchmark parameters were located for fallback use if needed: typical 20-year LFP battery life and 7,300 cycles; however, no specific battery fixed/variable O&M values were extracted here because the request prioritised plant-specific financial assumptions and the available results did not provide a clearly attributable BESS O&M line item for this project. The site is publicly announced at 189 MW / 600 MWh in NSW.