BESS · Samsung C&T Renewable Energy Australia Pty Ltd. · Storage - Battery
07 Jun 2026 16:25 → 14 Jun 2026 16:25 AEST
| Capex total (greenfield) |
$221.52M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No project-specific greenfield capex announcement located in available web results for Comet Park BESS - KCI. Use of AEMO/CSIRO benchmark capex was not applied because the capex search priority requires a project-specific figure first. AEMO 2024 battery storage benchmark parameters were located for fallback use if needed: typical 20-year LFP battery life and 7,300 cycles; however, no specific battery fixed/variable O&M values were extracted here because the request prioritised plant-specific financial assumptions and the available results did not provide a clearly attributable BESS O&M line item for this project. The site is publicly announced at 189 MW / 600 MWh in NSW.