12 Jun 2026 22:35 → 13 Jun 2026 22:35 AEST
| Capex total (greenfield) |
$295.36M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.77
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex could be verified from owner/developer or government sources in the available web results. Public evidence confirms Comet Energy Park is a proposed 120 MW / 800 MWh battery in Queensland, with development approval referenced in recent professional commentary. In the absence of project-specific capex, a fallback battery O&M proxy from AEMO/Aurecon 2024 was used only for variable O&M; fixed O&M was not extracted because the report tables are structured around example project durations rather than a direct per-MW figure for this exact site. Asset life set conservatively to 20 years based on large-scale lithium-ion BESS design life discussion in the AEMO/Aurecon review.