13 Jun 2026 15:20 → 14 Jun 2026 15:20 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex announcement located in web search. EPBC referral materials identify the project as two BESS assets totaling 550 MW / 3,399 MWh (400 MW / 1,950 MWh for Columboola West and 150 MW / 1,449 MWh for Columboola East), with construction proposed to commence in Q2 2026 and take about 21 months. GenCost 2024-25 notes large-scale battery costs fell by 20% year-on-year, but the report page opened here did not expose a usable project-specific $/kW benchmark; therefore I have not substituted a benchmark capex value. Fixed OPEX, efficiency, and asset life were not located from a high-quality source in the search results.