15 May 2026 01:55 → 14 Jun 2026 01:55 AEST
| Capex total (greenfield) |
$1,000.00M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 07 Jun 2026
Notes
A plant-specific capital expenditure figure was not found for the exact 400 MW Columboola BESS - KCI unit. The closest official StorEnergy / Australian Government source found was for the broader Bawurra Battery project at the Columboola location, which is a 550 MW / up to 3,399 MWh BESS with stated capital expenditure of AUD 1.0 billion. Because that figure does not match this unit's registered 400 MW capacity and may cover a broader project scope, it was not used as the capex input. For battery O&M, AEMO notes BESS variable operating cost is assumed to be $0 and fixed O&M ranges between $8-32/kW/year; no plant-specific O&M was found, so values are left blank rather than inferred. Battery emissions intensity is 0. Asset life defaulted to 20 years per AEMO/CSIRO assumptions.