03 Jun 2026 20:45 → 04 Jun 2026 20:45 AEST
| Capex total (greenfield) |
$200.87M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$502,183
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.73M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$27,293
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.64
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Plant-specific capital cost of $184 million was found in a planning submission and echoed in an industry article; no clearly published owner press release with the capex figure was located. The project is a 100 MW / 400 MWh standalone battery with an expected operating life of 30 years.