Wind · Energy Pacific (Vic) Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 08:25 → 15 Jun 2026 08:25 AEST
| Capex total (greenfield) |
$58.14M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,194,480
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.94M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$106,589
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.97
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific greenfield capex was found from secondary historical sources citing the project cost as A$30 million nominal at build/commissioning in 2001. No separate refurbishment capex found. Fixed O&M used server fallback; Codrington is being decommissioned, so operating assumptions may be less relevant for forward-looking modelling.