Clarke Creek Wind Farm (CLRKCWF1)

Wind · Squadron Energy Services Pty Ltd · Wind Turbine - Onshore

Commissioning AEMO: In Commissioning QLD1 Wind - Wind NEM data · 24 hours
347 MW
Registered nameplate capacity
24 hours revenue
$42.1k
Capacity factor
7.9%
Revenue / MWh
$63.95
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
347 MW
AEMO status In Commissioning
Project status Commissioning
Region QLD1
MLF 0.9430
DUID CLRKCWF1
Owner Squadron Energy Services Pty Ltd
Commissioned Sep 2025
Expected closure 2025-07-02
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
03 Jun 2026 17:10 → 04 Jun 2026 17:10 AEST

Dispatch & revenue

03 Jun 2026 17:10 → 04 Jun 2026 17:10 AEST

Revenue (× MLF)
$42.1k
Dispatched
658.5 MWh
Available
418.8 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9430
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-10-01 0.9497
2025-07-01 0.9430

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
347 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$1,292.29M

Shown in table
$1,292.29M (2026 real AUD)

Reported / source value
$1,040.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official government project summary for Clarke Creek Wind Farm Stage 1 reports capital expenditure of $1.04 billion.

Reference
Clarke Creek Wind Farm (Stage 1) – Australian Industry Participation Plan Summary – Project Phase (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW
$3,729,550

Shown in table
$3.73M (2026 real AUD)

Reported / source value
$3.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex / MWh storage
Fixed OPEX (annual)
$12.50M

Shown in table
$12.50M (2026 real AUD)

Reported / source value
$10.05M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated as 29,000 multiplied by 346.5 MW.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$36,070

Shown in table
$36.1k (2026 real AUD)

Reported / source value
$29.0k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/GHD benchmark fixed O&M for onshore wind is $29,000 per MW per year, and variable O&M is included in the fixed component.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No separate variable O&M is assumed for onshore wind in the benchmark.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Project-specific greenfield capital expenditure was found in an official Australian Industry Participation summary for Clarke Creek Wind Farm (Stage 1): $1.04 billion, with construction starting in 2021. Squadron Energy and Tattarang also describe Clarke Creek as a $3 billion renewable energy precinct/hub covering stages 1 and 2; that figure appears to be for the broader precinct, not this DUID's stage-1 share, so the reported stage-1 project cost was used for capex_total_aud. Fixed O&M uses the 2025 AEMO/GHD onshore wind benchmark of $29,000/MW/year and variable O&M is included in the fixed component. Onshore wind has no fuel cost or heat rate and zero direct emissions.

Sources