Clarke Creek Wind Farm (CLRKCWF1)

Wind · Squadron Energy Services Pty Ltd · Wind Turbine - Onshore

In Commissioning QLD1 Wind - Wind NEM data · 24 hours
347 MW
Registered nameplate capacity
24 hours revenue
$41.6k
Capacity factor
7.5%
Revenue / MWh
$66.93
Est. SRMC
$0.00/MWh
MLF
0.9430

Stats window 03 Jun 2026 15:45 → 04 Jun 2026 15:45 AEST

Key information
Capacity
347 MW
Status In Commissioning
Lifecycle Other
Region QLD1
DUID CLRKCWF1
Owner Squadron Energy Services Pty Ltd
Commissioned Sep 2025
Expected closure 2025-07-02
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model

Dispatch & revenue

03 Jun 2026 15:45 → 04 Jun 2026 15:45 AEST

Revenue (× MLF)
$41.6k
Dispatched
621.6 MWh
Available
552.9 MWh
Curtailed
39.1 MWh
Curtailment
7.1%
of available
MLF used
0.9430
end of period

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-10-01 0.9497
2025-07-01 0.9430

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
347 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$1,292.29M

Source value
$1,040.00M (2021 nominal)

How this was derived
Official government project summary for Clarke Creek Wind Farm Stage 1 reports capital expenditure of $1.04 billion.

Reference
Clarke Creek Wind Farm (Stage 1) – Australian Industry Participation Plan Summary – Project Phase (high confidence)

Capex refurbishment
Capex / MW
$3,729,550

Source value
$3.00M (2021 nominal)

Capex / MWh storage
Fixed OPEX (annual)
$12.50M

Source value
$10.05M (2021 nominal)

How this was derived
Calculated as 29,000 multiplied by 346.5 MW.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)

Fixed OPEX / MW-yr
$36,070

Source value
$29.0k (2021 nominal)

How this was derived
AEMO/GHD benchmark fixed O&M for onshore wind is $29,000 per MW per year, and variable O&M is included in the fixed component.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)

Variable OPEX / MWh
$0.00

Source value
$0.00 (2021 nominal)

How this was derived
No separate variable O&M is assumed for onshore wind in the benchmark.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Project-specific greenfield capital expenditure was found in an official Australian Industry Participation summary for Clarke Creek Wind Farm (Stage 1): $1.04 billion, with construction starting in 2021. Squadron Energy and Tattarang also describe Clarke Creek as a $3 billion renewable energy precinct/hub covering stages 1 and 2; that figure appears to be for the broader precinct, not this DUID's stage-1 share, so the reported stage-1 project cost was used for capex_total_aud. Fixed O&M uses the 2025 AEMO/GHD onshore wind benchmark of $29,000/MW/year and variable O&M is included in the fixed component. Onshore wind has no fuel cost or heat rate and zero direct emissions.

Sources