BESS · Isaac Wind and Solar Energy Pty Ltd · Storage - Battery
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Clarke Creek 2 BESS - KCI. The project appears to be publicly announced only, with no DUID and no confirmed capacity/energy values in the retrieved sources. A related Clarke Creek precinct source indicates a broader 1.2 GW hub and mentions some storage capacity, but it does not provide a specific capital cost for this BESS. Battery operating assumptions were not verified from a project-specific or AEMO/CSIRO source in the retrieved results, so they are left blank pending review.