Christies Beach Wastewater Treatment Plant (CBWWPV1)

Solar · South Australian Water Corporation · Solar PV - Single axis tracking

Commissioning AEMO: In Commissioning SA1 Solar - Solar NEM data · 24 hours
3 MW
Registered nameplate capacity
Est. SRMC
$0.00/MWh
Key information
Capacity
3 MW

AEMO status In Commissioning
Project status Commissioning (AI)

Region SA1
Coordinates

DUID CBWWPV1
Owner South Australian Water Corporation
Commissioned Oct 2022
Expected closure 2041
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 15:45 → 15 Jun 2026 15:45 AEST

Dispatch & revenue

14 Jun 2026 15:45 → 15 Jun 2026 15:45 AEST

No dispatch data for DUID CBWWPV1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
3 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$4.11M

Shown in table
$4.11M (2026 real AUD)

Reported / source value
$3.90M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
Searches found references to SA Water's zero-cost energy future program and Christies Beach solar array, but no plant-specific greenfield capital cost or refurbishment cost for CBWWPV1. Available sources indicate Christies Beach is part of a broader SA Water solar program, with installed capacity reported variably as 1.32 MW at Christies Beach in some sources and 4.8 MW / 8.5 MW for broader site or licence documentation, so capacity and project boundary are not fully consistent. In the absence of a verified site-specific capex figure, no estimated capex has been populated.

Sources