Solar · South Australian Water Corporation · Solar PV - Single axis tracking
Stats window 03 Jun 2026 15:45 → 04 Jun 2026 15:45 AEST
03 Jun 2026 15:45 → 04 Jun 2026 15:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$1,300,000
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
|
| Variable OPEX / MWh default |
$0.25
|
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: unknown · Status: needs review · Capex basis: unknown