Wind · Chepstowe Wind Farm Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 09:30 → 15 Jun 2026 09:30 AEST
| Capex total (greenfield) |
$14.27M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex or refurbishment cost was found in searched official/project sources. The site is an operating onshore wind farm with 6.15 MW capacity and commissioning date 2015-03-01. Onshore wind is typically modelled with zero fuel cost and zero direct emissions. AEMO/CSIRO benchmark values were located for onshore wind generally, but capex was not applied because no project-specific figure was found and the instruction prioritises owner/developer or government-announced project cost first.