Carwarp BESS

BESS · Canadian Solar · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
30 MW
Researched capacity
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
30 MW

AEMO spreadsheet lists 30.00 MW for Carwarp BESS; no independent public capacity source was returned in the provided web results.

AEMO status Publicly Announced
Project status Development (AI)

AEMO/registry status is Publicly Announced; no build/commissioning evidence found in provided results, so inferred as development.

Coordinates

DUID
Owner Canadian Solar
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Canadian Solar
Battery platform / chemistry Battery energy storage system (BESS) / lithium-ion
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
12 Jun 2026 20:35 → 13 Jun 2026 20:35 AEST

Dispatch & revenue

12 Jun 2026 20:35 → 13 Jun 2026 20:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
30 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific public CAPEX announcement for the Carwarp BESS could be verified from owner/developer/government sources. Recurrent Energy/Canadian Solar publicly describe Carwarp Energy Park as a 150 MWh battery energy storage and solar facility under construction for COD in 2026, but do not publish a total project cost. Given the unresolved plant-specific battery CAPEX and the fact the site appears to be part of a larger hybrid precinct, CAPEX is left blank rather than inferred from AEMO benchmarks. For battery storage O&M, AEMO/Aurecon 2024 provides indicative BESS annual O&M and EPC benchmarks, but the exact 30 MW Carwarp BESS duration/configuration is not publicly confirmed here, so no benchmark O&M is applied to avoid misclassification. Battery design life defaulted to 20 years from AEMO/Aurecon indicative LFP battery assumptions.