BESS · Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust · Storage - Battery
14 Jun 2026 00:00 → 14 Jun 2026 05:15 AEST
| Capex total (greenfield) |
$49.80M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$207,489
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific battery capex announcement was found for Carmody's Hill BESS. The available sources describe the Carmody's Hill project as a wind farm with an optional or future 123 MW / 118 MW BESS component, but they do not disclose a standalone BESS investment value. Because the user requested that capex only be reported when a project-specific investment figure exists, capex fields are left null pending a dedicated BESS cost announcement. The project-level figures found ($350 million in 2021 for the original wind-plus-battery proposal and ~$900 million in 2025 for the wind farm financing) appear to relate to the wider Carmody's Hill wind project, not a verified standalone BESS capex, so they were not used as BESS capex.