Carmody's Hill BESS

BESS · Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 307h
118/240 MW
Researched capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
118 MW / 240 MWh

AEMO spreadsheet entry provided in prompt (used only because no separate public capacity source was found).

AEMO status Publicly Announced
Project status Development (AI)

No public equipment-specific or project-delivery source located in the provided search results; inferred as a publicly announced, not-yet-commissioned BESS from the project description and 2029 commercial date.

Coordinates

DUID
Owner Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust
Commissioned Jan 2029
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
01 Jun 2026 00:00 → 13 Jun 2026 19:05 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 13 Jun 2026 19:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
118 MW / 240 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$49.80M

Shown in table
$49.80M (2026 real AUD)

Reported / source value
$47.21M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$207,489

Shown in table
$207.5k (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific battery capex announcement was found for Carmody's Hill BESS. The available sources describe the Carmody's Hill project as a wind farm with an optional or future 123 MW / 118 MW BESS component, but they do not disclose a standalone BESS investment value. Because the user requested that capex only be reported when a project-specific investment figure exists, capex fields are left null pending a dedicated BESS cost announcement. The project-level figures found ($350 million in 2021 for the original wind-plus-battery proposal and ~$900 million in 2025 for the wind farm financing) appear to relate to the wider Carmody's Hill wind project, not a verified standalone BESS capex, so they were not used as BESS capex.

Sources