Carmody's Hill BESS

BESS · Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
118/240 MW
Researched capacity / storage
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
118 MW / 240 MWh

AEMO spreadsheet entry provided in prompt (used only because no separate public capacity source was found).

AEMO status Publicly Announced
Project status Development (AI)

No public equipment-specific or project-delivery source located in the provided search results; inferred as a publicly announced, not-yet-commissioned BESS from the project description and 2029 commercial date.

Coordinates —

DUID —
Owner Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust
Commissioned Jan 2029
Expected closure —
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
25 Sep 2026 03:40 → 26 Sep 2026 03:40 AEST

Dispatch & revenue

25 Sep 2026 03:40 → 26 Sep 2026 03:40 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
118 MW / 240 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$49.80M

Shown in table
$49.80M (2026 real AUD)

Reported / source value
$47.21M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
—
Capex / MWh storage derived
$207,489

Shown in table
$207.5k (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific battery capex announcement was found for Carmody's Hill BESS. The available sources describe the Carmody's Hill project as a wind farm with an optional or future 123 MW / 118 MW BESS component, but they do not disclose a standalone BESS investment value. Because the user requested that capex only be reported when a project-specific investment figure exists, capex fields are left null pending a dedicated BESS cost announcement. The project-level figures found ($350 million in 2021 for the original wind-plus-battery proposal and ~$900 million in 2025 for the wind farm financing) appear to relate to the wider Carmody's Hill wind project, not a verified standalone BESS capex, so they were not used as BESS capex.

Sources