Capricorn BESS - KCI

BESS · ENEL Green Power Australia · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet label is Publicly Announced; treated here as pre-construction/development per user instructions.

Coordinates —

DUID —
Owner ENEL Green Power Australia
Commissioned Dec 2027
Expected closure —
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
24 Sep 2026 19:05 → 25 Sep 2026 19:05 AEST

Dispatch & revenue

24 Sep 2026 19:05 → 25 Sep 2026 19:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
—
Capex refurbishment
—
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement was found for Capricorn BESS - KCI in the searched owner/developer and official project sources. The project materials confirm a proposed 300 MW / 1,200 MWh BESS at Bouldercombe, but do not state total investment cost. AEMO/CSIRO battery cost benchmarks were therefore not used for capex because no verified benchmark value was extracted here. Internal technology defaults are retained only for O&M fallback values; fixed OPEX annual was not calculated because capacity-specific input was not supplied in the prompt and no verified plant-specific O&M source was found.

Sources