Solar · IBERDROLA AUSTRALIA HOLDINGS PTY LIMITED · Solar PV - Fixed
13 Jun 2026 15:45 → 14 Jun 2026 15:45 AEST
| Capex total (greenfield) |
$2.32M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Iberdrola Australia states Capital East Solar Farm 1 was completed in 2013 at 120 kW and expanded in 2018 to 500 kW with Capital East Solar 2; this is inconsistent with the user-provided 2 MW capacity for DUID CESF1, so plant-specific capex/O&M were not reliably assignable to the requested unit from the available sources. No credible plant-specific construction cost announcement was found in the searched sources, so no capex estimate was applied.