Canyonleigh BESS

BESS · X-Elio Australia Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 586h
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

No project documents or owner announcements were available in the provided results; treated as a publicly announced/proposed BESS based on the listing context.

Coordinates —

DUID —
Owner X-Elio Australia Pty Ltd
Commissioned —
Expected closure —
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
01 Sep 2026 00:00 → 25 Sep 2026 09:45 AEST

Dispatch & revenue

01 Sep 2026 00:00 → 25 Sep 2026 09:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
—
Capex refurbishment
—
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$8,439

Shown in table
$8.4k (2026 real AUD)

Reported / source value
$8.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the 2-hour BESS benchmark value of A$8,000/MW-yr as a fallback operating assumption.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Source indicates BESS long-term service rather than a standard variable O&M value; no numeric benchmark was clearly available in the extracted lines.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
Canyonleigh BESS is a proposed 300 MW / 1,200 MWh standalone battery in NSW. No project-specific greenfield capex announcement was found in the searched owner/government sources, so capex remains unfilled rather than substituting a benchmark. AEMO 2024 benchmark BESS fixed O&M of A$8,000/MW-yr was used as an operating assumption; variable O&M was not clearly provided for BESS in the source and has been left at zero. Commissioning/online date was not verified from the searched sources.