14 Jun 2026 23:25 → 21 Jun 2026 23:25 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$8,439
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Canyonleigh BESS is a proposed 300 MW / 1,200 MWh standalone battery in NSW. No project-specific greenfield capex announcement was found in the searched owner/government sources, so capex remains unfilled rather than substituting a benchmark. AEMO 2024 benchmark BESS fixed O&M of A$8,000/MW-yr was used as an operating assumption; variable O&M was not clearly provided for BESS in the source and has been left at zero. Commissioning/online date was not verified from the searched sources.