BESS · Edify Energy Pty Ltd · Storage - Battery
12 Jun 2026 22:35 → 13 Jun 2026 22:35 AEST
| Capex total (greenfield) |
$71.72M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$10.90M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$51,913
Shown in table Reported / source value |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No project-specific greenfield capex figure was found in searched owner/government sources for Callide Solar Power Station BESS. The site page confirms the project remains in development phase and indicates construction is anticipated in FY2025/26, with up to 200MW / 800MWh storage. In the absence of a reported plant-specific investment value, operating assumptions were set using AEMO/Aurecon 2024 battery storage benchmarks for a co-located 200MW BESS case. The benchmark provides indicative EPC cost and fixed O&M; I used the 200MW co-located case and scaled fixed O&M to the site's 210MW battery capacity. Variable O&M is not typically specified for BESS in the benchmark, so it remains null. 90% round-trip efficiency and 25-year life are from the AEMO/Aurecon battery assumptions.