12 Jun 2026 22:35 → 13 Jun 2026 22:35 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement for Callide Energy Hub - KCI (200 MW battery) was found in the searched owner, government, or project pages. The available public source identified the site as a publicly announced 200 MW battery, but did not provide a total project cost. To avoid misattributing a broader precinct or unrelated project cost, capex remains unfilled. Operational/O&M assumptions were also not found specifically for this site. The project appears separate from CS Energy's Chinchilla and Greenbank battery projects, which have published costs but are not applicable to this DUID.