13 Jun 2026 23:50 → 14 Jun 2026 23:50 AEST
| Capex total (greenfield) |
$80.17M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$1.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
AGL’s hydro page confirms Burrendong Power Station is 19 MW and leased by AGL Hydro, but no plant-specific greenfield construction cost or refurbishment cost was found in the searched official sources. The page also states Burrendong generates using summer irrigation and flood mitigation flows and that AGL Hydro has a lease for the site from November 1996 with three 10-year extension options. Because no project-specific capex was located, no benchmark capex was inserted here pending further review.