| Capex total (greenfield) |
$1,024.59M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$13.65M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$46,107
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.23
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 05 Jun 2026
Notes
No owner/developer-reported project investment figure was found in web search. CAPEX is therefore based on AEMO's pumped hydro cost modelling reference for 'Bunkers hill' (published total cost $1,000M for 300 MW), treated as an estimated benchmark rather than reported project cost. Bunkers Hill appears in AEMO's pumped hydro cost modelling material with 300 MW / 2,400 MWh / 8 hours. Site-specific OPEX and lifecycle assumptions were not found; internal defaults used for fixed and variable OPEX. Commissioning date supplied by user (2033-12-01) is not used as a source-backed operating assumption.