13 Jun 2026 01:55 → 14 Jun 2026 01:55 AEST
| Capex total (greenfield) |
$147.68M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.70M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$13,502
Shown in table Reported / source value |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex figure was found in the searched owner/developer, ARENA, or project-financing sources. The project is reported as a 200 MW / 400 MWh battery within ARENA’s large-scale battery round, while Revera Energy’s current project page describes the broader Bungama BESS project as 250 MW / 500 MWh with operations expected by 2026. O&M uses AEMO/Aurecon 2024 BESS assumptions for a 200 MW, 4-hour BESS with dedicated grid connection; fixed O&M is taken from the 4-hour case and multiplied by 200 MW. Emissions are zero for battery storage on direct operational basis.