13 Jun 2026 06:20 → 14 Jun 2026 06:20 AEST
| Capex total (greenfield) |
$105.49M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific reported greenfield capex for Bundy Energy Hub B (BESS) was found in the searched official or high-quality sources. The closest authoritative sources identify Bundey/Bundy Energy Hub projects as publicly announced, with Bundy Energy Hub B (BESS) listed by AEMO at 250 MW and no storage capacity provided. SynCo Global / Genaspi project pages describe the Bundey/Bundy BESS initiative but do not disclose a total project cost. Because no reported plant-specific capex was found, capex fields are left null rather than using a benchmark as reported. The project page indicates a larger Bundey BESS and Solar Project with 1,200 MW / 3,900 MWh BESS, but this does not map cleanly to the 250 MW Bundy Energy Hub B unit, so no proportional cost allocation was inferred.