Bundy Energy Hub B (BESS)

BESS · SynCo Global · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
250 MW
Researched capacity
Est. SRMC
$1.50/MWh
Key information
Capacity (AI)
250 MW

AEMO spreadsheet figure in prompt indicates 250 MW; no independent public capacity source was found in provided search results.

AEMO status Publicly Announced
Project status Development (AI)

SynCo Global project listing / public announcement context provided in prompt; no build/commissioning evidence found.

Coordinates

DUID
Owner SynCo Global
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
13 Jun 2026 06:20 → 14 Jun 2026 06:20 AEST

Dispatch & revenue

13 Jun 2026 06:20 → 14 Jun 2026 06:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
250 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$105.49M

Shown in table
$105.49M (2026 real AUD)

Reported / source value
$100.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific reported greenfield capex for Bundy Energy Hub B (BESS) was found in the searched official or high-quality sources. The closest authoritative sources identify Bundey/Bundy Energy Hub projects as publicly announced, with Bundy Energy Hub B (BESS) listed by AEMO at 250 MW and no storage capacity provided. SynCo Global / Genaspi project pages describe the Bundey/Bundy BESS initiative but do not disclose a total project cost. Because no reported plant-specific capex was found, capex fields are left null rather than using a benchmark as reported. The project page indicates a larger Bundey BESS and Solar Project with 1,200 MW / 3,900 MWh BESS, but this does not map cleanly to the 250 MW Bundy Energy Hub B unit, so no proportional cost allocation was inferred.

Sources