Bundy Energy Hub A (BESS)

BESS · Syn-Co Global · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 6h
250 MW
Researched capacity
Est. SRMC
$1.58/MWh
Key information
Capacity (AI)
250 MW

AEMO spreadsheet lists 250.00 MW for Bundy Energy Hub A (BESS), but no corroborating public announcement found in the provided search results.

AEMO status Publicly Announced
Project status Development (AI)

No project-specific public source found; inferred from AEMO/Publicly Announced status and absence of evidence of construction or commissioning.

Coordinates

DUID
Owner Syn-Co Global
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry battery
Inverter OEM
Inverter / PCS model
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 06:20 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 06:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
250 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$105.49M

Shown in table
$105.49M (2026 real AUD)

Reported / source value
$100.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$6.59M

Shown in table
$6.59M (2026 real AUD)

Reported / source value
$1.33M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific greenfield capex announcement was found for Bundy Energy Hub A (BESS). AEMO classifies the site as a publicly announced 250 MW battery project in South Australia, with storage capacity not supplied. For battery O&M and life assumptions, used AEMO/Aurecon 2024 review benchmarks for a 200 MW BESS as the closest current system-level proxy; applied the server-side fallback fixed O&M per MW because the benchmark excerpt available does not provide a directly site-specific BESS O&M figure for this project.

Sources