13 Jun 2026 05:05 → 14 Jun 2026 05:05 AEST
| Capex total (greenfield) |
$105.49M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$6.59M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Bundy Energy Hub A (BESS). AEMO classifies the site as a publicly announced 250 MW battery project in South Australia, with storage capacity not supplied. For battery O&M and life assumptions, used AEMO/Aurecon 2024 review benchmarks for a 200 MW BESS as the closest current system-level proxy; applied the server-side fallback fixed O&M per MW because the benchmark excerpt available does not provide a directly site-specific BESS O&M figure for this project.