BESS · Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust · Storage - Battery
16 May 2026 17:05 → 15 Jun 2026 17:05 AEST
| Capex total (greenfield) |
$189.87M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$210,970
Shown in table |
| Fixed OPEX (annual) |
$11.87M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No project-specific greenfield capex figure was found for the Bulli Creek BESS (Trina) asset. Genex sources confirm the Bulli Creek stage is a multi-stage clean energy park and the battery configuration has been described in Genex materials, but no owner-disclosed total investment amount for this battery tranche was located in the searched sources. Because a project-specific capex figure was not found, capex fields are left null rather than substituting a benchmark. Operating-cost fallback values were applied from the user-provided internal defaults.