Bulli Creek BESS (Trina)

BESS · Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
450/900 MW
Researched capacity / storage
Est. SRMC
$1.58/MWh
Key information
Capacity (AI)
450 MW / 900 MWh

AEMO spreadsheet figures provided in the prompt: 450 MW / 900 MWh.

AEMO status Publicly Announced
Project status Development (AI)

Project is only publicly announced / not yet under construction, based on the owner-described status in the prompt and lack of evidence of commissioning or operation.

Coordinates

DUID
Owner Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM Trina Storage
Battery platform / chemistry battery energy storage system
Inverter OEM
Inverter / PCS model
Equipment confidence low
Stats window
14 Jun 2026 15:55 → 15 Jun 2026 15:55 AEST

Dispatch & revenue

14 Jun 2026 15:55 → 15 Jun 2026 15:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
450 MW / 900 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$189.87M

Shown in table
$189.87M (2026 real AUD)

Reported / source value
$180.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Directly indicates the battery project capex was not yet disclosed in Genex’s investor materials.

Reference
Investor Presentation - February 2024 (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MWh storage derived
$210,970

Shown in table
$211.0k (2026 real AUD)

Fixed OPEX (annual)
$11.87M

Shown in table
$11.87M (2026 real AUD)

Reported / source value
$11.25M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Applied the provided internal default value.

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Applied the provided internal default value.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No project-specific greenfield capex figure was found for the Bulli Creek BESS (Trina) asset. Genex sources confirm the Bulli Creek stage is a multi-stage clean energy park and the battery configuration has been described in Genex materials, but no owner-disclosed total investment amount for this battery tranche was located in the searched sources. Because a project-specific capex figure was not found, capex fields are left null rather than substituting a benchmark. Operating-cost fallback values were applied from the user-provided internal defaults.