01 Jun 2026 00:00 → 15 Jun 2026 07:15 AEST
| Capex total (greenfield) |
$590.72M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Genex materials confirm Bulli Creek Battery is a planned 400MW/1,600MWh stage of the Bulli Creek Clean Energy Park, but the searches did not surface a plant-specific greenfield construction/investment cost for this battery stage. Because no reported project capex was found, capex remains unset rather than using a fallback benchmark. The project has been described by Genex as a future stage and was targeted for FID in CY2025 in 2024 materials; more recent Genex pages in 2026 show the project has been reconfigured toward 425MW/1,700MWh and 600MW/2,400MWh variants, so the 400MW/1,600MWh configuration may be superseded. No verified operating date was found.