Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST
29 May 2026 04:00 → 30 May 2026 04:00 AEST
| Capex total (greenfield) |
$89.45M
Source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$421,941
Source value |
| Capex / MWh storage default |
$350,000
|
| Fixed OPEX (annual) |
$45.81M
Source value |
| Fixed OPEX / MW-yr |
$216,068
Source value How this was derived Reference |
| Variable OPEX / MWh |
$13.86
Source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Bremer Battery 4 in searched owner/developer and public sources. The Bremer Battery Project site identifies Libra Energy Pty Ltd as developer and indicates an 850 MW / 3,400 MWh four-hour BESS project, but does not publish a project cost. Battery O&M and life assumptions were taken from AEMO/Aurecon 2024 cost and technical parameters review for storage-like assets; fixed O&M is captured as a per-MW annual figure and total annual O&M was not calculated because source alignment for this specific battery project is uncertain without a verified plant cost and duration for the registered unit.