14 Jun 2026 00:00 → 14 Jun 2026 01:55 AEST
| Capex total (greenfield) |
$89.45M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$2.86M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$13,502
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 05 Jun 2026
Notes
No project-specific greenfield capex announcement was found for Bremer Battery 3 from the owner/developer or government sources. AEMO/Aurecon 2024 battery benchmark was used as fallback for operating assumptions only. Bremer Battery website describes an 850 MW / 3,400 MWh project with 2028 operational timing, but no total project cost was disclosed. Fixed O&M was taken from the AEMO/Aurecon 2024 BESS benchmark for a 4-hour / 200 MW project and scaled per MW to the 212 MW site capacity.