03 Jun 2026 22:15 → 04 Jun 2026 22:15 AEST
| Capex total (greenfield) |
$89.45M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield CAPEX announcement for Bremer Battery 2 (212 MW) was found in the owner/developer sources searched. The public project site for Bremer Battery describes the broader Bremer Battery Project as 850 MW/3,400 MWh, but does not disclose a total project investment figure. Internal fallback CAPEX/OPEX defaults were not applied because the request prioritised source-backed research and no project-specific capex was found. The project site states a 25-year warranty and about 35-year lifespan.