15 May 2026 08:00 → 14 Jun 2026 08:00 AEST
| Capex total (greenfield) |
$89.45M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$5.59M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: unknown · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex figure was found in owner/developer materials or search results for Bremer Battery 1. The project website confirms an 850 MW / 3,400 MWh battery and states Libra Energy Pty Ltd is the developer, but provides no total project investment amount. Battery O&M and technical parameters were therefore set using AEMO 2024 benchmark-style values as fallback/defaults; these are not plant-specific reported costs. The project website also states a 25-year warranty and an expected lifespan of about 35 years.